Turnkey production workshop construction
Industrial workshops with steel frames built around your production: overhead cranes, process areas, heavy-duty power. Full cycle — from machine foundations to commissioning.
Why a workshop fails to start on time
Typical miscalculations when a «box» is built instead of a production facility
What we design in for your production
The decisions that determine whether the workshop works from day one
Frame for crane loads
Columns and crane runway beams for overhead or underslung cranes of the specified capacity. We calculate the frame for real loads, not a rough «safety margin».
Foundations for equipment
Separate foundations for machines, presses and lines accounting for support reactions, dynamics and vibration — so precision equipment doesn't drift.
Process platforms and pits
Mezzanines, service platforms, pits and embedded parts for your process and material-flow routes.
Power for production
Dedicated power, a transformer substation, power wiring, compressed air, supply-and-exhaust ventilation and dust extraction.
Industrial floors for heavy load
Floors resistant to equipment weight, impact, chemicals and abrasion — for the specific conditions of your workshop.
Amenity blocks and safety
Administrative and amenity premises, compliance with occupational health, fire safety and industrial sanitation standards.
What turnkey general contracting covers
Every stage in one hand — one contract, one contact engineer, full responsibility for the result
How we work
Request & consultation
We take your enquiry, clarify the task, scope and timeline. We respond within 24 hours.
Site visit & brief
Our engineer visits the site: measurements, soil and conditions assessment. We compile the technical brief.
Design & estimate
We prepare the design solution and a detailed estimate (5–7 business days). We fix the scope of work.
Contract
We sign a contract with a fixed price and schedule. No hidden charges along the way.
Construction
Groundwork, steel frame, facades, engineering — with our own equipment and crews. Weekly photo reports.
Handover & warranty
Commissioning, signing of acceptance acts, warranty obligations under the contract.
Why clients choose TEHMAS
Our own fleet and team
Our own equipment fleet and permanent specialists. Your deadline doesn't depend on someone else's schedule.
Hard conditions are our specialty
Weak soils, tight deadlines, non-standard structures. We don't shy away from the difficult.
Full responsibility
One contract and one contact engineer. We don't shift blame onto subcontractors.
Base 30 min from Kyiv
Brovary is an ideal location for construction across the Kyiv region. Fast equipment deployment to your site.
Response within 24 hours
A feasibility study and a ballpark estimate within one business day.
Fixed price and deadlines
We fix the estimate and schedule in the contract. No hidden charges during construction.
Other construction services
Workshop construction FAQ
How much does turnkey workshop construction cost?
The cost depends on the area, structure type, crane loads, equipment foundations and engineering. After a brief and a site visit we provide a ballpark estimate within one business day and fix the final price in the contract.
Can you account for an overhead crane?
Yes. We design the frame, columns and crane runway beams for an overhead or underslung crane of the specified capacity. The crane parameters are factored in at the brief stage.
Do you build foundations for specific equipment?
Yes. Based on the support reactions and dynamic characteristics of your equipment we design separate foundations to avoid vibration and preserve machine accuracy.
How long does it take to build a workshop?
It depends on the area, structural complexity and engineering. We fix the exact schedule in the contract after design; a fast-track approach lets us start the groundwork in parallel with designing the next stages.
Can you build next to an operating production line?
Yes. We work in stages and sections, coordinating the schedule with your production to minimise or fully avoid downtime.