Reconstruction and reinforcement of industrial facilities
Surveys, reinforcement of load-bearing structures, extensions and upgrades — we restore a building's service life and adapt it for new equipment. Without stopping production where possible.
Why reconstruction goes wrong
Mistakes that hide the problem instead of solving it
What we do in a reconstruction
From honest diagnostics to a finished, reinforced facility
Technical survey
Load-capacity assessment, defect mapping, measurements and a report on the real condition of the structures.
Reinforcement of load-bearing structures
Columns, beams, trusses and floors — reinforced for new loads by calculation.
Foundation reinforcement and repair
For new equipment and increased loads, accounting for soils and settlement.
Roof, facade and engineering replacement
Upgrading the envelope and networks without demolishing the whole building.
Extension and reconfiguration
New spans, mezzanines and expanded areas for production growth.
Work without stopping production
In stages and sections, coordinating the schedule with your process — where possible.
What turnkey general contracting covers
Every stage in one hand — one contract, one contact engineer, full responsibility for the result
How we work
Request & consultation
We take your enquiry, clarify the task, scope and timeline. We respond within 24 hours.
Site visit & brief
Our engineer visits the site: measurements, soil and conditions assessment. We compile the technical brief.
Design & estimate
We prepare the design solution and a detailed estimate (5–7 business days). We fix the scope of work.
Contract
We sign a contract with a fixed price and schedule. No hidden charges along the way.
Construction
Groundwork, steel frame, facades, engineering — with our own equipment and crews. Weekly photo reports.
Handover & warranty
Commissioning, signing of acceptance acts, warranty obligations under the contract.
Why clients choose TEHMAS
Our own fleet and team
Our own equipment fleet and permanent specialists. Your deadline doesn't depend on someone else's schedule.
Hard conditions are our specialty
Weak soils, tight deadlines, non-standard structures. We don't shy away from the difficult.
Full responsibility
One contract and one contact engineer. We don't shift blame onto subcontractors.
Base 30 min from Kyiv
Brovary is an ideal location for construction across the Kyiv region. Fast equipment deployment to your site.
Response within 24 hours
A feasibility study and a ballpark estimate within one business day.
Fixed price and deadlines
We fix the estimate and schedule in the contract. No hidden charges during construction.
Other construction services
Reconstruction FAQ
Why is a technical survey needed before reconstruction?
Without a survey it's impossible to know a building's real strength reserve. It shows what can be kept, what to reinforce and what to replace — and protects you from unnecessary spend and unsafe decisions.
Can a building be reinforced for heavier equipment?
Yes. Based on the survey and calculation we reinforce structures and foundations for new loads — often cheaper than building from scratch.
Do you work without stopping production?
Where technically possible, yes. We break the work into stages and sections and coordinate the schedule with your production to minimise downtime.
Which is cheaper — reconstruction or a new facility?
It depends on the building's condition and your goals. The survey gives the exact answer: sometimes reinforcing the existing structure is better, sometimes building new is. We don't push the more expensive option.
How much does reconstruction cost?
The cost depends on the scope of reinforcement, structure and engineering replacement. After a survey and site visit we provide a ballpark estimate and fix the final price in the contract.