Cargo Ship, Odesa

Cargo ship hull preparation in dry dock. Marine fouling removal, blasting to Sa 2½ and marine anti-corrosion system application.

Before
Before — Cargo Ship, Odesa
After
After — Cargo Ship, Odesa

Project Metrics

Area
4 500 м²
Standard
Sa 2½
Duration
25 днів

Work Details

  • 1Marine fouling and old coating removal
  • 2Sandblasting to Sa 2½
  • 3Marine epoxy primer — 150 μm
  • 4Antifouling coating — 200 μm
  • 5Lloyd's Register compliance